2nd Floor Renovation
Project: 2nd Floor Renovation
Location: St. Clair Shores, MI
Completion Time: 15 weeks
For this second floor renovation our team completed in St. Clair Shores gave a new sense of life to this condo. The initial step for this project was a complete demolition of the second floor. The upstairs bathroom remodel consisted of removing two walls in the walk in closet that was adjacent to the bathroom. From there we re-configured the plumbing layout to accommodate a freestanding bathtub which was not in the original space. Once all of the mechanicals were updated and our team then went ahead with the finish work which consisted of new lighting, installing a larger vanity, installing a free standing bath tub, installing a stand up shower, installing tile throughout the main bathroom floor, installing a penny mosaic wall tile in the shower along with a herringbone shower tile for the floor. The space was then completed with fresh paint and new moldings.
Simultaneously our team was working on the remainder of the first floor which included new lighting in both bedrooms, installing waterproof laminate throughout the second floor, new moldings, building out a custom closet with shelving in the master bedroom, and installing three custom handrails along with the custom finished spindles. The rest of the floor then received a fresh coat of paint and upgraded door hardware. When this build was complete our client was more than thrilled and another dream space was made into a reality!